Terms & Conditions
Whilst the upmost attention to detail has been given to build your 2D & 3D machine control models, all information should be checked & verified on-site by the engineer prior to works commencing.
All installations & calibrations of the machine control system on the item of plant, which the machine control model will be used, are the sole responsibility of the client.
MCM do not have any control over the physical cab equipment, it is the client’s responsibility to make sure all equipment is working correctly before the model is uploaded.
​
Any errors, variations or discrepancy’s must be highlighted in writing before the work starts and MCM notified of the errors, variations or discrepancies.
MCM is not responsible or liable for the validation of the machine control model once it is in use on-site without the correct engineering checks taken. The initial engineering checks must be recorded, witnessed and verified.
The engineering checks must be completed every day by the operator and engineer before the machine control model is used.
Any technical queries must be brought to the attention of MCM in writing before the works start.